Onos fabricates and assembles unitised curtain wall panels in its own factory for facade contractors in Dubai and across the UAE. We build each panel from the specified Schüco, Reynaers or Inoform Systems profiles, to your approved shop drawings and panel schedule. Glazing, panel brackets and crating are agreed in the quotation, and your own crews hoist and hang the panels on site.
Schüco describes unitised facades as moving value “from the building site to the production hall” (Schüco facades). For components assembled on site, see our stick curtain wall range; the stick vs unitised curtain wall guide compares the two, and facade fabrication covers packages that use both.
Unitised panels are part of our product range; where a tower has balconies, the glass balustrades can come from us too.
Product range
Each panel type is assembled to your approved drawings and panel schedule, in the system your facade engineer specified.
-
Vision Panels
Framed and glazed with the vision glass on your panel schedule, beaded or structurally glazed as the system allows. Reynaers offers both on ElementFaçade 7.
-
Spandrel Panels
Opaque areas built in as designed. Schüco, for example, lists metal, printed glass or stone for AF UDC 80.
-
Opening-Vent Panels
Concealed opening vents within the panel, where the system provides them, such as the Schüco AF UDC 80 CV below.
-
Corner and Special Panels
Corner panels and one-off specials, built to the details on your approved drawings.
-
Mock-up Panels
Built from the same drawings and system as production, for the test programme your specification sets.
-
Panel Brackets
Panel-side brackets fitted at the positions on your approved drawings, where the quotation includes them. Slab-side anchors stay with you.
Unitised curtain wall systems we fabricate
We fabricate Schüco, Reynaers and Inoform Systems aluminium profiles. These are the system houses’ published figures for representative unitised and modular series: values from tested configurations, not project guarantees.
| System | Face width or depth | Lowest Uf (W/m²K) | Unit or glass limit | Air / water | Wind (published) | Sound (Rw) |
|---|---|---|---|---|---|---|
| Schüco AF UDC 80 SG (structurally glazed) | 80 mm face | 0.73 | Unit up to 3,000 × 4,000 mm, 1,000 kg | AE 1200 / RE 1650 | 2.5 / 3.75 kN/m² | 50 dB |
| Schüco AF UDC 80 CV (concealed vent) | 80 mm face | 1.8 | Unit up to 3,000 × 4,000 mm, 1,000 kg | AE 1200 / RE 1650 | 2.5 / 3.75 kN/m² | 48 dB |
| Reynaers ElementFaçade 7 | 75 mm face | 1.3 | Glass up to 300 kg | AE1200 / RE1200 | 2,400 Pa | 43 dB |
| Inoform F9M (modular) | 65 mm system depth | n/p | n/p | Class 4 / 9A | C5 / B5 | 38 dB |
Sources: Schüco UAE technical data for AF UDC 80 SG and AF UDC 80 CV; Reynaers Middle East technical information for ElementFaçade 7; Inoform Systems product page for F9M, whose air, water and wind figures are EN 12207, EN 12208 and EN 12210 classes. n/p = not published. Inoform also publishes F80 as a modular curtain wall with an 80 mm profile depth and no performance figures. Each system house publishes wind figures on its own basis.
Facade units, fabricated off site
Panels leave our factory framed and, where the quotation includes it, glazed and crated to the facade contractor’s drawings.
Send DrawingsWhat we supply
Each panel moves from approved drawings to a crated delivery in the same order. The quotation sets out which steps are in our scope.
-
Frame assembly
Mullion, transom and stack-joint profiles cut, machined and joined into the panel frame to the drawing dimensions.
-
Glazing and infill
Vision glass and spandrel infill fitted to the panel schedule, with gaskets placed as the system details require. Glass supply is agreed in the quotation.
-
Sealing
Frame joints, corners and weather seals sealed to the system details.
-
Panel checks
Size and squareness, glass make-up, seals, bracket positions, finish and panel marks, checked to the inspection and test plan agreed with you.
-
Protection and crating
Finished faces protected and crates labelled by panel mark, floor and elevation, designed around your unloading and hoisting arrangements.
-
Delivery batches
Batch sizes and panel order agreed in the quotation and planned with your site team around the hoisting plan and floor readiness.
How we work with facade contractors
Onos works behind the facade contractor, turning approved drawings into finished panels. Each quotation confirms the split line by line.
| Criterion | Facade contractor | Onos (fabricator) |
|---|---|---|
| Design and engineering | Designs the facade, selects the system with the consultant and runs the calculations | Works to that design; raises written queries where drawings and system details disagree |
| Shop drawings and panel schedule | Prepares them and takes them through approval | Fabricates from the approved revision |
| Panels | Sets panel types, glass and spandrel make-ups and finish | Assembles the panel frames; glazing and sealing as quoted |
| Brackets and anchors | Slab-side anchors and embeds, and their design | Panel-side brackets, where the quotation includes them |
| Mock-ups and testing | Appoints the test house, runs the programme and owns the results | Can fabricate and assemble the mock-up panels the specification calls for |
| Crating and delivery | Sets the installation sequence, hoisting plan and site logistics | Protection, labelling, crating and delivery batches as quoted |
| Installation and site tests | Its own crews or subcontractors: hoisting, hanging, sealing between panels and site testing | Outside our scope |
Bracket systems differ by range. Schüco’s AF UDC 80, for example, uses brackets adjustable along three axes and a saddle gasket to join units (Schüco AF UDC 80). Send the bracket details with the drawings so the supply line is clear from the first price.
Specification and what to send
Tender or approved drawings, the panel schedule, the specification and the programme are enough to price panels, mock-up panels and delivery. The specification should name the system and series and set the engineer’s wind and movement criteria, tolerances and test regime, which may reference the European curtain walling standard EN 13830.
- Elevations, sections and typical panel details
- Panel schedule: types, sizes, marks and positions
- Glass and spandrel make-ups, and the finish
- Bracket and anchor details, and the scope split
- Mock-up and test requirements
- Programme, hoisting plan and delivery sequence
Specification questions
What is a unitised curtain wall?
A unitised curtain wall is made of complete panels that are framed, glazed and sealed in a factory, then hoisted and hung on brackets fixed to the building’s slabs. Neighbouring panels interlock at their mullion and stack joints. A stick curtain wall, by contrast, is assembled and glazed piece by piece on site. Specifications written to US practice call it a unitized curtain wall.
Can you build performance mock-up panels?
Yes. We can fabricate and assemble mock-up panels from your drawings and the specified system, for the test programme your specification sets. Your chosen test house runs the tests and your team owns the results. Changes that come out of the mock-up go into your revised drawings, and production panels follow the revision you approve.
What drives the cost of unitised panels?
Repetition comes first: the number of panel types against the total panel count. Then panel size and weight, glass and spandrel make-ups, corners and special panels, bracket design, finish, mock-up panels, crating and the number of delivery batches. We price from drawings and the panel schedule rather than an area rate, so repeated typical panels price differently from one-off panels.
Price your unitised curtain wall package
Tell us what you need. Onos replies with questions or a written fabrication quotation, and never quotes for installation.
- Drawings: elevations, sections and the opening or panel schedule
- System and series, or the performance the specification asks for
- Finish, glass make-up and hardware
- Quantities or a BOQ, and the delivery emirate
- Programme: when you need fabricated units on site
- Who installs: your team or your nominated installer
Drawings and BOQs: [email protected]