We are a curtain wall supplier and fabricator for facade contractors and main contractors in Dubai and across the UAE. Our factory cuts and machines mullions, transoms, brackets, pressure plates and cover caps to your approved shop drawings, in the system series your project specifies. Onos supplies the components only: your own crews or installation subcontractor erect and glaze the wall on site.
We also assemble unitised curtain wall panels in our own factory. To choose between the two approaches, see our stick vs unitised curtain wall guide; packages that combine both are covered under facade fabrication.
Curtain wall is part of our product range, and the punched aluminium windows on the same building can be fabricated on the same system family.
Product range
Five component groups, each fabricated to your approved shop drawings in the specified system. Glass is normally glazed on site by the installer; glass supplied with the framing can be agreed in the quotation.
-
Mullions
Cut to length and machined for transom joints, splices and bracket fixings, as the approved drawings and system details show.
-
Transoms
Cut and end-machined to suit the mullion profile, with the drainage and ventilation openings the system details call for.
-
Brackets
Prepared to the bracket details on your shop drawings, in the system or bespoke design your engineer has set.
-
Pressure Plates
Cut to length and drilled at the fixing centres the system specifies, to clamp the glass and gaskets on site.
-
Cover Caps
Cut to length in the specified finish, to cover the pressure plates on each elevation.
Systems we fabricate
We fabricate Schüco, Reynaers and Inoform Systems aluminium profiles. These representative stick series are shown with each system house’s own published figures: values from tested configurations, not project guarantees.
| System | Face width | Lowest Uf (W/m²K) | Air / water | Wind (published) | Sound (Rw) |
|---|---|---|---|---|---|
| Schüco FWS 50 | 50 mm | 1.5 | AE / RE 1200 | 2.0 / 3.0 kN/m² | 48 dB |
| Schüco FWS 60 | 60 mm | 1.3 | AE / RE 1200 | 2.0 / 3.0 kN/m² | 46 dB |
| Reynaers ConceptWall 50 | 50 mm | 0.56 | AE1950 / RE1950 | 2,400 Pa | 47 dB |
| Reynaers ConceptWall 60 | 60 mm | 0.6 | AE1950 / RE1950 | 2,400 Pa | 55 dB |
| Reynaers SlimWall 35 | 35 mm | 0.71 | AE1200 / RE1200 | 2,000 Pa | 47 dB |
Sources: Schüco UAE technical data for FWS 50 and FWS 60; Reynaers Middle East technical information for ConceptWall 50, ConceptWall 60 and SlimWall 35. Schüco labels frame values “Uf (≥)”, Reynaers notes that performance depends on profile combinations, and each house publishes wind figures on its own basis. Inoform’s modular F80 and F9M systems are listed with our unitised curtain wall.
A stick mullion, in plan
An indicative plan section through a pressure-plate mullion. Onos fabricates the members; the facade contractor’s crews fix them and glaze on site.
Mullion
The box section that spans floor to floor and carries the glass loads back to the brackets.
Thermal isolator
Separates the pressure plate from the mullion nose to cut heat transfer.
Pressure plate
Clamps the glass edges to the mullion through the gaskets.
Cover cap
Snaps over the pressure plate and sets the external sightline.
Gaskets
EPDM gaskets each side of the glass, inside and out.
Insulated glass units
Glazed on site in a stick system, to the facade contractor’s schedule.
Fixing screw
Runs through the pressure plate into the mullion’s screw port at set centres.
- Detail
- Section D–D · Mullion
- Scale
- NTS
- Status
- Indicative
What we supply
The quotation sets the scope line by line. For a stick package it can include the following.
-
Specified finish
Members and cover caps in the powder coating or anodising on your finish schedule. See powder coating vs anodising.
-
Samples and mock-up parts
Finish samples and mock-up components, where your specification calls for them, made ahead of production for your test programme.
-
Checks to your plan
Members checked to the inspection and test plan agreed with you, with hold points for your own inspections where the plan sets them.
-
Labels and bundles
Labels can carry drawing mark, elevation and floor, and bundles can be split by elevation, floor or zone, with finished faces protected in transit.
-
Delivery drops
Drops, access times and unloading are agreed in the quotation and planned against your site programme, which matters where laydown space is tight.
-
Supply only
We never install. Erection, site glazing, sealing and site testing stay with your crews or the installation subcontractor you appoint.
How we work
A facade package runs in five stages. The facade contractor controls the design at each gate, and durations are confirmed with the quotation.
-
Send the package
Drawings, the specification with system and series, finishes, quantities or a BOQ, and the programme. Gaps come back to you as written queries.
-
Quotation
Priced with clarifications and exclusions listed, so it can be levelled against other bids. Brackets, checks, packing and delivery drops are agreed here.
-
Approved shop drawings
Your team designs and engineers the facade and takes the shop drawings through approval. We fabricate from the approved revision; see our shop drawings guide.
-
Fabrication
Cutting lists come from the approved drawings, and queries go back in writing before cutting. Brackets, pressure plates and caps are prepared to match the members.
-
Release and delivery
Checked members are labelled, bundled and delivered in the quoted drops, ready for your crews to erect and glaze.
Specification and what to send
Drawings, a specification and the system series are enough to start. We price from drawings and quantities rather than a rate per square metre, because the series, the number of member and bracket types, machining, finish, mock-ups and delivery drops drive the cost.
- Tender, IFC or shop drawings: elevations, sections and typical details
- Specification with the system series and any variants
- Bracket details, and whether brackets are in our scope
- Finish and colour schedule
- Quantities or a BOQ, the programme and delivery zones
Specification questions
Are you a curtain wall manufacturer or a facade contractor?
Onos is a curtain wall fabricator, not a facade contractor, and it does not install. Many curtain wall companies in the UAE design and install the whole facade; we supply the fabricated system instead. System houses such as Schüco, Reynaers and Inoform Systems design and test the profiles, and facade contractors engineer and install the facade. As one of the curtain wall manufacturers in the UAE working between them, we fabricate the system profiles to the facade contractor’s approved drawings for its own crews to erect.
Do you supply the glass for a stick curtain wall?
On stick systems the glass is normally glazed on site by the installer, so many packages are framing only. If you want glass supplied with the framing, include the glass make-ups and quantities in your enquiry, and the quotation will state what is in scope. Our glazing page explains how glass is supplied with the aluminium systems we fabricate.
Can a curtain wall have opening windows?
Yes. System houses publish concealed vents and insert units that sit within the curtain wall grid. Schüco’s UAE facade range, for example, includes the FWS 60 CV mullion/transom facade, where opening units and fixed fields look the same from outside. Vent type, size and hardware follow the system data and your specification.
Who tests a curtain wall: the fabricator or the facade contractor?
The project specification sets the tests, and the facade contractor’s chosen test house runs them. Specifications often ask for laboratory air, water and structural tests on a mock-up, then site water tests on the installed wall. We can fabricate the samples and mock-up parts the specification calls for, and we do not issue test results. For reference, EN 13830 is the European product standard for curtain walling kits.
Price your curtain wall package
Tell us what you need. Onos replies with questions or a written fabrication quotation, and never quotes for installation.
- Drawings: elevations, sections and the opening or panel schedule
- System and series, or the performance the specification asks for
- Finish, glass make-up and hardware
- Quantities or a BOQ, and the delivery emirate
- Programme: when you need fabricated units on site
- Who installs: your team or your nominated installer
Drawings and BOQs: [email protected]